310 East 46 Street

310 East 46 Street

DETAILS

  • (Area)

          Floor 18 Walls: 4055 SF Floor :  850 SF Mold : 339.9 LF

  • (Area)

          Floor 19 Walls: 2821 SF Floor :  600 SF Mold: 235.1 LF

  • (Area)

          Floor 20 Walls: 2760 SF Floor :  600 SF Mold : 230.0 LF

  • (Area)

          Floor 21 Walls: 2664 SF Floor :  600 SF Mold : 222.0 LF

  • (Area)

          Floor 22 Walls: 2682 SF Floor :  600 SF Mold: 223.5 LF

  • (Area)

          Floor 23 Walls: 2314 SF Floor :  600 SF Mold: 192.8 LF

  • (Area)

          Floor 24 Walls: 2397 SF Floor :  600 SF Mold : 199.7 LF

  • (Area)

          Floor 25 Walls: 2344 SF Floor :  600 SF Mold: 195.3 LF

  • (Area)

          Floor 17 Walls: 4038 SF Floor : 850 SF Mold : 336.5 LF

  • (Area)

          Floor 16 Walls: 5211 SF Floor : 1075 SF Mold : 434.2 LF

  • (Area)

          Floor 26 / PH Walls: 2316 SF Floor :  600 SF Mold: 193.0 LF

  • (Area)

          Floor 3  Walls: 7050 SF Floor : 850 SF LVT    : 210 SF Mold: 587.5 LF

  • (Area)

          Floor 12 Walls: 5456 SF Floor : 1075 SF Mold: 454.7 LF

  • (Area)

          Floor 11 Walls: 5618 SF Floor : 1075 SF Mold : 468.2 LF

  • (Area)

          Floor 10 Walls: 5660 SF Floor : 1075 SF Mold : 471.7 LF

  • (Area)

          Floor 9 Walls: 5529 SF Floor : 1075 SF Mold : 460.7 LF

  • (Area)

          Floor 8 Walls: 5529 SF Floor : 1075 SF Mold: 460.7 LF

  • (Area)

          Floor 7 Walls: 5501 SF Floor : 1075 SF Mold : 458.4 LF

  • (Area)

          Floor 6 Walls: 5501 SF Floor : 1075 SF Mold: 458.4 LF

  • (Area)

          Floor 5  Walls: 5501 SF Floor : 1075 SF Mold: 458.4 LF

  • (Area)

          Floor 15 Walls: 5266 SF Floor : 1075 SF Mold : 438.8 LF

  • (Area)

          Floor 14 Walls: 5560 SF Floor : 1075 SF Mold : 463.3 LF

  • (Area)

          Floor 4 Walls: 5753 SF Floor : 1075 SF Mold: 479.4 LF

  • (Point)

    New Carpet from 3rd Floor to 26th FloorCarpet complete with backing (state tile or non-tile options)

  • (Area)

    Large Floor Spaces - 13 Floors in total Levels 3 to 16 (Excluding 13th Floor which does not exist in the building layout.)

  • (Area)

    Medium Floors This category includes Floors 17 and 18, A total of 2 floors.

  • (Area)

    Small Floors This category includes 8 floors, spanning from the 19th floor to the 26th floor / (PH) floor.

  • (Point)

    Removal of existing wallpaper and the installation of new wall coverings across all corridors.   Remove the existing wallpaper from all corridors. Each corridor has two different wallpapers. Once the old wallpaper is removed, prep the walls properly before installing the new one. Ensure a clean, smooth finish with no bubbles or misalignment.  

  • (Point)

    Remove all existing crown moldings from the 3rd floor to the 26th floor. Install new crown molding designed for wire management.

  • (Point)

    Door Hardware Compliance and Standardization   Standardization of Lower Door Hardware Locksets:All lower door hardware locksets will be conformed and unified with ADA-compliant lever handles to ensure accessibility and compliance with regulations. Removal and Compliance of Resident Door Top-Locks:Existing top-locks on resident doors will be removed to align with standard security and accessibility requirements. Comprehensive Door Hardware Upgrades:Door hardware will be addressed for all doors, ensuring consistency, functionality, and compliance across the facility.  

  • (Point)

    New Lighting Installation The scope of work includes the installation of new lighting fixtures, both in areas requiring demolition related to HVAC and in areas where no demolition is necessary. For spaces involving HVAC-related structural adjustments, lighting installation will be coordinated with the required demolition work to ensure seamless integration. 

  • (Point)

    Apartment ID Replacement Replacement of apartment identification (ID) numbers. Remove existing apartment IDs and install new standardized unit numbers.

  • (Point)

    Installation of Tamper-Resistant Wall Outlets Remove existing outlets, installation of new tamper-resistant receptacles in compliance with electrical safety codes, and verification of proper functionality. All work will be performed in accordance with NEC (National Electrical Code) requirement

  • (Point)

    Compactor Room Improvements Painting and lighting upgrades in all compactor rooms. 

  • (Point)

    Installation of Soft-Close Hinges for Stairwell and Laundry Doors Install soft-close hinges on stairwell and laundry doors to prevent slamming and enhance functionality. This scope covers the removal of existing hinges, installation of new soft-close hinges, and adjustment of door operation to ensure smooth and controlled closing. 

  • (Point)

    Install new signage: diagram maps, stairwell signs, wayfinding markers, safety notices, and other required signage. All signage will be strategically placed for visibility and adherence to building codes, ADA regulations, and safety standards to enhance clarity and guidance for residents, visitors, and staff.

  • (Point)

    Elevator Frame Casing Replacement, elevator frame casings to enhance durability, aesthetics, and compliance with building standards.

  • (Point)

    Laundry Room Improvements   Painting: New paint on walls and ceilings to improve appearance. Ceiling Tile Replacement: Removal of existing ceiling tiles and installation of new ceiling tiles. Sensor Light Fixture Installation: Replacement of existing light fixtures sensor-activated.  

  • (Point)

    New Furniture Installation The project includes the selection and installation of new furniture elements:   New Mirrors: Installation of new decorative & functional mirrors. Benches: Placement of seating benches to provide convenience and comfort for residents and visitors. New Tables: Installation of new tables in appropriate locations.

  • (Point)

    Replacement of resident doorway saddles

  • (Point)

    Reclad exisiting sitting area columns (Two Columns in Total)

  • (Point)

    Lobby Lighting Upgrade Remove of existing lobby light fixtures and the installation of new fixtures to enhance design and illumination.

  • (Point)

    Re-upholster lobby furnishings Replacement or re-upholstery of lobby furnishings to enhance comfort, and aesthetics. 

  • (Point)

    New Lobby Furniture Remove existing furniture and install new selections.

  • (Point)

    Lobby Tile Replacement Remove of existing lobby tiles and the installation of new high-quality tiles.

  • (Point)

    Update decorative lit panels at desk and mailroom

  • (Point)

    Power wash and paint walls of the stairwells from the 1st to the 26th floor. The scope covers deep cleaning of walls, stairs (top and bottom), and handrails through power washing, followed by the application of high-quality, durable paint.

  • (Point)

    Stairwell Wall Finishing (26th Floor to Rooftop & 25th Floor) Preparation and finishing of walls along the stair flights leading from the 26th floor to the rooftop, as well as at least one flight of stairs from the 26th to the 25th floor.

  • (Area)

    Remove Wallpaper: 101,520 SFInstall Wallpaper : 101, 520 SFCarpet Tile: 22,250 SFCrown Moldings : 8640 LFStairwell to Paint : 17,388 SF