    Specify Wall Finishes for the hallway (front of Ste 390) where we will close one of the existing doors and for the new door opening on the 5th floor.

  • (Point)

    Existing layout on the demo drawings is inaccurate. Need updated plan that accurately reflects at least two new partitions requiring demolition.

  • (Point)

    Ceiling and Lighting: Re Note 4 on Sheet G0.01, "existing ceiling grid and tiles to remain throughout," need to confirm whether ceiling tiles are stored, as many were removed. Additionally, for Note 11 (same sheet) re existing light fixtures, need a count and type of stored fixtures, as well as a light fixture schedule detailing what needs to be provided.

  • (Point)

    Wall Base and Window Treatments: Wall base has not been specified; we need that information. Additionally, if there are any finishes specs for window treatments, more information would be appreciated.

  • (Point)

    Hydraulic Calculation Report: This is required for our plumber’s review.

  • (Point)

    Cold Water Line Confirmation: Plumber claims that the cold-water line inside the unit is 1/2" instead of 1". Need confirmation if the existing line is 1” or ½” . If 1" line required, should we upgrade the line inside the unit or replace it from the main riser?

  • (Point)

    Fire Damper Relocation: Need to confirm status of the fire damper in the new storage room where the door will be closed. No damper was observed during the walkthrough; location?

  • (Point)

    Transfer Grill: One transfer grill is missing in one of the offices. Do we need to install one there?

  • (Point)

    Exit Signs: None are marked on the drawings; we need the locations from the architects. Please note that on the electrical notes there is information about the exit signs and other fixtures. Please have the electrical team check the notes to avoid any delays from them in preparing their proposal and schedule.

  • (Point)

    Light Fixture Schedule: Either need confirmation that light fixtures are readily available, or need a schedule provided. Drawings only show vendor’s contact information. But drawings show other recessed downlights and pendant lights, linear slots, undercabinet lights etc. Only 2x2 and 2x4 troffers installed or stored?

  • (Point)

    Any specific info about the Internet or low voltage system?